PROVISION OF TEMPORARY PLUMBING LINES
- Remove the existing A.C. / C.I. drain pipes & fittings.
- Provide & lay in place temporary PVC drain pipes & PVC fittings of approved make, in proper line & level with proper spacers so as to locate the lines at least 2’ away from the wall.
REPLACEMENTS OF DRAIN LINES (P.V.C. PIPES & FITTINGS)
- Remove the temporary drain pipes & fittings.
- Replace with the new P.V.C drain pipes & fittings of approved make, in proper line & level with proper spacers so as to locate the lines at least 2” away from the wall.
- Seal the joints properly with rubber solution.
NOTE:- The G. I. Brackets to be provided so as to locate the lines at least 2” away from the wall.
REMOVAL & REPLACEMENT OF NEW PVC DRAIN LINES
- Remove the temporary drain pipes & fittings.
- Replace the last 10’ of the pipe with the new PVC Line.
NOTE :- The G. I. Brackets to be provided so as to locate the lines at least 2” away from the wall. No separate charges will be paid for the G.I. Brackets.
REPLACEMENT OF WATER SUPPLY PLUMBING
KI-TEC COMPOSITE PE- AL-PE PIPES WATER SUPPLY PIPE- Dismantle all the existing G.I. plumbing lines of various diameters including fittings.
- Replace the same with new composite pipes & fittings of approved make using proper spacers so as to locate the lines at least 2” away from the wall.
CLEANING AND REFIXING OF G.I. PLUMBING
- Dismantle all the existing G.I. plumbing lines of various diameters including fittings.
- Clean the lines thoroughly, using mechanical means or manual means as well as acid treatment.
- Refix the same cleaned G.I lines & Replace the fittings with new fittings of approved make, using proper spacers so as to locate the lines at least 2” away from the wall.
REPLACEMENT OF G.I. CONNECTOR PIECES
- Remove all the existing Horizontal G.I. Connector pieces (Barrel Nipples) of ½”, ¾” , 1” , 11/4” and 11/2” dia connector pipes.
- Replace the corroded & damaged Barrel Nipples (Wall Pieces) with C Class pipes and with PVC Sleeves, by making appropriate holes, making required connections, testing & refilling the holes to match with the plastered surface.
PLUMBING AT SBI COLONY, NERUL